Solar/Photovoltaic Bischkek for sale Kyrgyzstan | Large-scale 400 MWp solar project in Kyrgyzstan near Bishkek

Large-scale 400 MWp solar project in Kyrgyzstan near Bishkek 

ID: KG-PV400/1295423
#Solar #Photovoltaic #ForSale #Bischkek #Kyrgyzstan
Solar/Photovoltaic Bischkek for sale Kyrgyzstan | Photovoltaics und SolarInvestment in Kyrgyzstan
Photovoltaics und SolarInvestment in Kyrgyzstan
Solar/Photovoltaic Bischkek for sale Kyrgyzstan | Photovoltaics und SolarInvestment in KyrgyzstanSolar/Photovoltaic Bischkek for sale Kyrgyzstan | SolarEnergy in KyrgyzstanSolar/Photovoltaic Bischkek for sale Kyrgyzstan | QR-CODE ...

Solar/Photovoltaic for sale
Price on request. 
KG-720007 Bischkek
Kyrgyzstan

Contact owner

 Info >>>
 
 E-mail
   eMail
 All offers of the estate supplier
Finances
Price on request. 
Available according to agreement
Areas
Property1.052,65 acre
Description
This project involves the construction, ownership, and operation (BOO) of a photovoltaic plant with a capacity of 400 MWp / 315 MWac west of the capital Bishkek, near the border with Kazakhstan. A plant that will provide Kyrgyzstan with long-term energy security is being built on 426 hectares of flat land with no ecological restrictions.

The planned annual production is 670 GWh in the first full year of operation. This is made possible by modern single-axis trackers, with an assumed annual efficiency loss of only max. 0.4%. The plant will receive a 25-year PPA with a guaranteed price of US$50/MWh (indexed in local currency) and offers planning security through a possible term extension of up to 49 years.

#SolarEnergy #Photovoltaics #RenewableEnergy #SolarInvestment #Infrastructure #EnergySecurity #Kyrgyzstan #PPA #BESS #CleanPower
Position
West of Bishkek, Kyrgyzstan
On the border with Kazakhstan
Optimal topographical conditions: flat, vegetation-poor land outside protected areas
Fittings
Total capacity: 400 MWp / 315 MWac
Area: 426 ha (annual lease ~US$107,000 at US$250/ha)
Grid connection: double 220 kV line (2 km) to 220/500 kV substation
License for full feed-in access already issued
Possibility of integrating a BESS (battery storage) system with simple approval and parallel commissioning
Other
The project significantly strengthens Kyrgyzstan's energy security: in 2024 alone, the country had to import 3,400 GWh of electricity. This plant will make a stable, local contribution to the electricity supply, with additional potential through battery storage.
Disclaimer
Der Autor übernimmt keinerlei Gewähr hinsichtlich der inhaltlichen Richtigkeit, Genauigkeit, Aktualität, Zuverlässigkeit und Vollständigkeit der Informationen. Haftungsansprüche gegen den Autor wegen Schäden materieller oder immaterieller Art, welche aus dem Zugriff oder der Nutzung bzw. Nichtnutzung der veröffentlichten Informationen, durch Missbrauch der Verbindung oder durch technische Störungen entstanden sind, werden ausgeschlossen. Alle Angebote sind unverbindlich. Der Autor behält es sich ausdrücklich vor, Teile der Seiten oder das gesamte Angebot ohne gesonderte Ankündigung zu verändern, zu ergänzen, zu löschen oder die Veröffentlichung zeitweise oder endgültig einzustellen.